Wind farm unlocks aFRR revenue via partnership with Edmij and Withthegrid
Customer
Confidential
The situation
The operator of a 5 MW wind farm was selling its production on the day-ahead, intraday and imbalance markets. Balancing capacity was the one revenue stream left on the table.
Qualifying for aFRR was the blocker. TenneT requires a four-second control loop: measurements out of the asset and setpoints back in, every four seconds, without interruption.
What was built
Edmij connected the wind farm through the Teleport, which handles the four-second data exchange in both directions. That link runs into Edmij’s own trading and control system, so the asset meets the grid operator requirements.
The result
The wind farm now earns from aFRR, resulting in 20-30% increase in yearly earnings.